DAARWIN-GEMINI A novel tool to predict advance rate of a TBM in real-time

Online and in person at: Level 9, 340 Adelaide Street, Brisbane

Overview SAALG Geomechanics, in collaboration with ACCIONA, has developed DAARWIN-GEMINI, a software system designed to optimize the performance of tunnel boring machines (TBMs) using machine learning-based techniques. The system key features include an advanced architecture for querying and processing data from the TBM database, big data analysis and visualization in a web browser, a [...]

Geocomposite Tunnel Invert Drainage – Online technical presentation

Webinar

Presentation abstract: Cavidrain Invert geocomposite systems are used to form a drainage layer beneath the road pavement of tunnel floors. The use of Cavidrain Invert offers a number of advantages over more traditional methods (which use crushed stone and pipes) such as: (i) reduced excavation (as they form a much thinner layer compared to [...]

ITA Lecture – EPB tunnelling: environmental aspects and re-use opportunities of the conditioned muck

Online

The rapid development of mechanised tunnelling in the last decades has increased the tunnelling community’s focus on the environmental aspects of tunnel construction. The excavation carried out by using EPB (Earth Pressure Balance) machines often requires the use of foaming agents, specific products that are added to the medium intended to be excavated, in order [...]

Hobsons Bay main Yarra crossing duplication project

Melbourne Engineers Australia office

The Hobsons Bay Main Sewer (HBMS), constructed in the 1960s, transfers approximately 30 per cent of Melbourne’s wastewater to the Western Treatment Plan at Werribee. The sewer alignment has a single sewer crossing under the Yarra River, which has deteriorated to a point where it requires rehabilitation and/or replacement. The Hobson Bay main Yarra [...]

ITA Lecture – Practical Aspects of Segmental Tunnel Lining Design

Webinar - Online only

Topic: Practical Aspects of Segmental Tunnel Lining Design After several decades of continuous progress, mechanized tunnelling has now become the main method applied in almost all types of geology, all sizes, and in increasingly shorter lengths. The predominant excavation support system for TBM tunnels consists of a one-pass precast concrete segmental liner which in [...]

North East Link SEM Ventilation Tunnel and Adit Construction

Delve Underground Level 15 / 385 Bourke Street, Melbourne, Victoria

Overview The construction of the North East Link (NEL) tunnels is well underway! The largest transport infrastructure project in Victorian history consists of 6.5 km tunnels from Watsonia to Bulleen, and it will complete Melbourne’s orbital freeway network. The presentation will provide an overview of the recently constructed ventilation tunnel and adits using Sequential [...]

ATS technical session: Design of large underground caverns for pumped hydro projects

Online and in person at: Level 9, 340 Adelaide Street, Brisbane

Overview This webinar will be focused on the design of large underground caverns, a crucial topic with the current development of multiple Pumped Hydro schemes. The main speaker will be Mousa Hazrati Aghchai, who has a PhD in rock mechanics and a solid background in geotechnics/rock mechanics in Tunnelling, Hydropower, and Dam engineering with [...]

ITA Lecture Series – Face Stability Issues

Webinar - Online only

This instalment of the Lunchtime lecture series will focus on practical Face Stability Issues. This episode will feature three lectures: • Examples of tunnel face instability on site - Elena Chiriotti • Overview of mechanisms and methods to evaluate tunnel face stability - Nicolas Berthoz • Case of deep tunnels in a clay medium [...]

North East Link Project update and Australian Tunnelling Society annual meeting

Online and in person at Arup Melbourne Sky Park 1, Melbourne Quarter, 699 Collins Street, Victoria

PLEASE NOTE: Contrary to what it says on the Engineers Australia registration page, this event is completely free to ATS members. Please make sure you register using your ATS email address and the discount will be applied as you move through the registration process.  Event summary Explore this year's key tunnelling developments at the [...]

Ground freezing below a river estuary

EA Brisbane Office Level 9, 340 Adelaide St (EA Office), Brisbane, Queensland

Overview A new 1.48km road tunnel has been excavated beneath the Świna straits in northwest Poland using a 13.46m slurry TBM. To overcome the challenges posed by low overburden and complex geology, artificial ground freezing was implemented to enable safe excavation for the emergency egress structures required for motorway operations. This presentation will focus [...]

ITA Lecture Series #42 – The seismic design of tunnels and underground structures

Webinar Register via the link to join!

This instalment of the Lunchtime lecture series will focus on 'The seismic design of tunnels and underground structures' in collaboration with ITA AITES WG9. The episode will feature three lectures and will finish with a Q&A with all speakers. It will begin at 13:00 CET. Overview of seismic design - Conrad Felice The international [...]

Innovative water management for underground constructions

Webinar - Online only

Summary Water ingress during underground construction has been known to cause structural instability, heightened maintenance costs, and pose an array of safety hazards. These hazards range from the seemingly minimal moisture damage to the more severe cracking.  Traditionally, solutions such as grouting, drainage pipes, and repair injections have been employed. However, these methods are [...]