Calendar of Events
M Mon
T Tue
W Wed
T Thu
F Fri
S Sat
S Sun
0 events,
0 events,
0 events,
1 event,
Geocomposite Tunnel Invert Drainage – Online technical presentation
Geocomposite Tunnel Invert Drainage – Online technical presentation
Presentation abstract: Cavidrain Invert geocomposite systems are used to form a drainage layer beneath the road pavement of tunnel floors. The use of Cavidrain Invert offers a number of advantages over more traditional methods (which use crushed stone and pipes) such as: (i) reduced excavation (as they form a much thinner layer compared to crushed […]
0 events,
0 events,
0 events,
0 events,
0 events,
0 events,
0 events,
0 events,
0 events,
0 events,
0 events,
1 event,
ITA Lecture – EPB tunnelling: environmental aspects and re-use opportunities of the conditioned muck
ITA Lecture – EPB tunnelling: environmental aspects and re-use opportunities of the conditioned muck
The rapid development of mechanised tunnelling in the last decades has increased the tunnelling community’s focus on the environmental aspects of tunnel construction. The excavation carried out by using EPB (Earth Pressure Balance) machines often requires the use of foaming agents, specific products that are added to the medium intended to be excavated, in order to […]
0 events,
0 events,
0 events,
0 events,
0 events,
0 events,
0 events,
0 events,
0 events,
0 events,
0 events,
0 events,
0 events,
0 events,
1 event,
Unlocking underground opportunities – the world of tunnelling
Unlocking underground opportunities – the world of tunnelling
NOTE: On the registration link it says there is a $30 charge for technical members. This isn't correct and when you actually register it will not charge you. We are working to fix this. Apologies for any confusion. Overview The ATS welcomes all members, non-members, and students to join us for an insightful panel discussion […]
0 events,
0 events,
0 events,
0 events,
0 events,
0 events,
1 event,
Hobsons Bay main Yarra crossing duplication project
Hobsons Bay main Yarra crossing duplication project
The Hobsons Bay Main Sewer (HBMS), constructed in the 1960s, transfers approximately 30 per cent of Melbourne’s wastewater to the Western Treatment Plan at Werribee. The sewer alignment has a single sewer crossing under the Yarra River, which has deteriorated to a point where it requires rehabilitation and/or replacement. The Hobson Bay main Yarra crossing […]
1 event,
ATS-SOM Workshop
Let's focus on tunnel Systems! Join suppliers and peers in a two-day event at the Victorian Tunnelling Centre (VTC) in Melbourne, packed with visits, presentations and hands on demonstrations of tunnel systems products. Express your interest in attending now. Free of charge to ATS members! About the workshop The ATS-SOM Workshop, held in collaboration with […]